
•Page
globalcontract.com
42
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Table Mounted End Shelf - Continued
STEP 5: Place work surfaces on the legs/beams support structure and adjust the
work surfaces so that they line up with the external edges of the Table End Shelf’s
top.
Secure work surfaces and hanging brackets with supplied screws.
STEP 6: Insert and rotate the gable bottom bracket into the leg, slide it up against
the bottom gable edge.
STEP 7: Align the brackets with pre-drilled holes in the gable as illustrated and
secure with supplied screws (A).
NOTE: Use supplied machine screws (B) to secure the bracket to the threaded
insert in shelf’s bottom.
Trim the vertical cable manager cover and snap it back in place.
STEP 8: Place two angled support brackets over table beams with Adjustable
clamps. Secure both brackets by driving supplied machine screws into threaded
inserts in the back of End table shelf.( A)
STEP 9: Ensure that the shelf is level
STEP 10: Pre-tension the bracket by pushing its end along the beam and work
surface toward the shelf and, while pushing, secure the bracket by driving sup-
plied screws into the bottom of work surface.
5
7
6
8
10
10
B
A
A
NOT UL LISTED