
•Page
globalcontract.com
54
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Display Wall Cable Manager - TV / Display Facing the Work Surfaces:
Display Wall Cable Manager - TV / Display Facing Away from the Work Surfaces:
There are two versions of TV / Display cable managers: One is intended for TV
/ Display facing the work surfaces and the other mounts under the TV / Display
facing outside of the table assembly. Both Cable managers differ in lengths and
features corresponding their specifi c functions.
A
) Two Back 2 Back work surfaces.
STEP 10a: If the table top consists of two separate Back 2 Back work surfaces
rest the aluminum extrusion on top of the work surface.
STEP 11a: Align holes in the extrusion with pre-drilled holes in the TV / Display
wall and secure with 4 supplied wood screws.
STEP 12a: Organize cables in the Cable manager base, orient the Cable manager
cover so that the protruding part points down, between the two Back 2 Back
tops and snap the cover into the base.
B
) One monolithic work surface with a scoop.
STEP 10b: If the table top consists of one monolithic top with a scoop insert the
extruded aluminum base into the scoop and align its bottom with the bottom of
the work surface.
STEP 11b: Align holes in the extrusion with the second set of pre-drilled holes
in the TV / Display wall and secure with 4 supplied wood screws.
STEP 12b: Organize cables in the Cable manager base, orient the Cable man-
ager cover so that the protruding part points up, snap the cover into the base
and slide it down so it lines up with the bottom of the work surface.
There are two versions of TV / Display cable managers: One is intended for TV
/ Display facing the work surfaces and the other mounts under the TV / Display
facing outside of the table assembly. Both Cable managers differ in lengths and
features corresponding their specifi c functions.
C
) TV / Display facing away from work surfaces.
STEP 10c: Align holes in the extruded aluminum manager with pre-drilled holes
in the TV / Display wall.
STEP 11c: Secure with 6 supplied wood screws.
STEP 12c: Thread the cables through the hole in the TV / Display wall, organize
them in the Cable manager base and snap the cover into the base.
11a
11c
12a
12c
10a
10c
10b
12b
11b
NOT UL LISTED