
Page
•
globalcontract.com
15
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Organize data/communication cables on the ground just below their future
location.
STEP 12: Thread cable through data/communication opening (located in the
middle of each Power Trough). Connect terminals and snap terminal plate into
data/communication opening.
STEP 13: Capture cable bundles in the extruded Data Cable Manager trough
STEP 14: Snap Data Cable Manager Trough into the bottom of Power Trough.
Ensure that Data/communication Troughs are securely engaged with all tabs at
the bottom of Power Troughs. (Refer to actual part)
12
14
13
Duplex Retainer Removal
To disassemble, push simultaneously onto the teeth until the retainer comes
loose. Once loose, rotate away from duplex and follow opposite of installation
(Step 9 &10) in order to remove.