
Page
•
globalcontract.com
31
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Storage Mounted B3 Divider - Panel Frame Installation
STEP 1: Insert support bracket against the inner vertical wall as indicated above.
STEP 2: Secure support bracket through the inside of panel with provided ma-
chine screws. Holes in the bracket should line up with holes in panel.
STEP 3: Insert panel into the gap (as shown) until it hits the support bracket.
STEP 4: Once in place, fasten bracket to storage through the inside with provided
screws. Repeat on 4 sides. At this point, the base feed (if applicable) should be
installed. Base feed CAN NOT be installed once storage is back to back.
STEP 5: Top of storage should line up with each other and the end of the panel.
STEP 6: For installing units with power distribution modules, proceed to do so.
After installing power distribution modules (if applicable) fi nish by closing the
full fabric tile; or for units with a combo accessory tile & fabric, see following
instructions.
1
2
3
5
6
4
NOT UL LISTED