
Page
•
globalcontract.com
39
• Summer 2017
GLOBAL
Contract
Table Mounted Centre Shelf
INSTALLATION GUIDELINES
Note: Centre Mount Shelf MUST be installed before Under Work Surface Power
Trough.
STEP 1: Line up Bridges Storage leg holes with pilot holes on the worksurface.
STEP 2: Align Back 2 Back divider brackets with the edge of the Bridges storage
leg. Fasten provided screw through predrilled central hole in Back 2 Back divider
brackets.
STEP 3: Leave screw a little loose, so that the Back 2 Back divider bracket can
rotate.
STEP 4: Turn Back 2 Back divider bracket 90º so that it is parallel to the work sur-
face. Let the shelf rest on top of the work surface. Make sure the shelf is centred.
STEP 5: Go underneath the work surface, rotate the brackets back to original
position (See Step 2) and fasten with supplied screws one side at a time.
STEP 6: Once screws are fastened and Back 2 Back bracket is in correct position,
tighten screw with Allen key until snug.
4
4
5
6
3
2
1
NOT UL LISTED