FE02-0244b
10. Rotate the crankshaft 180 °, so that cylinder No.2 and 3
are at BDC positions. With the new engine oil lubricate the
piston, use universal tools and a wood handle to install
cylinder No.2 piston connecting rod component marked
with cylinder No.2 location.
Note
The dot mark on the piston top surface should face
the engine front end. Note that during the installation
process prevent the lower connecting rod hitting the
crankshaft journal, causing damage.
FE02-0245b
11. Install the cylinder No.2 connecting rod bearing cap
marked with cylinder No.2 location.
Note
The dot mark on the bearing cap should face the
engine front end.
FE02-0246b
12. Install and tighten cylinder No.2 connecting rod bearing
cap bolts.
Torque
First Pass: 20 Nm (Metric) 14.8 lb-ft (US English)
Second Pass: 51 Nm (Metric) 37.8 lb-ft (US English)
2-406
Engine Mechanical System JL4G18-D
Engine
EC718/EC718RV EC715/EC715RV 10/2009
Summary of Contents for EC715 2009
Page 4: ......
Page 330: ...Next Step 10 End 2 248 Fuel System JL4G18 D Engine EC718 EC718RV EC715 EC715RV 10 2009 ...
Page 1164: ......
Page 2008: ......