FE08-0039b
5.
Install the left and right lower air-conditioning ventilation
pipes.
FE08-0040b
6.
Connect the air-conditioning assembly harness
connector.
7.
Install the instrument panel retainers.
8.
Install the instrument panel.
9.
Install inlet/outlet warm air pipes, fastening the clamps.
10. Remove the heater core side warm air inlet and outlet
pipes and clamps
Torque: 8-10 Nm (Metric) 5.9-7.4 lb-ft (US English)
11. Fill the engine coolant.
12. Carry out the air-conditioning refrigerant filling process.
8.2.8.6 Expansion Valve Replacement
Removal Procedure
FE08-0020b
1.
Remove the air-conditioning assembly. Refer to
Air-conditioning Assembly Replacement
8-54
Automatic Air-conditioning
Heating, Ventilation and A/C System
EC718/EC718RV EC715/EC715RV 10/2009
Summary of Contents for EC715 2009
Page 4: ......
Page 330: ...Next Step 10 End 2 248 Fuel System JL4G18 D Engine EC718 EC718RV EC715 EC715RV 10 2009 ...
Page 1164: ......
Page 2008: ......