Installation Procedure:
FE03-0061b
1.
Engage the 3rd/4th gear synchronizer to the 4th gear.
FE03-0062b
2.
Install the 3rd/4th shift shaft and other components.
FE03-0063b
3.
Install the 3rd/4th shift shaft retaining bolts.
Transmission / Drive Axle
Manual Transmission
3-77
EC718/EC718RV EC715/EC715RV 10/2009
Summary of Contents for EC715 2009
Page 4: ......
Page 330: ...Next Step 10 End 2 248 Fuel System JL4G18 D Engine EC718 EC718RV EC715 EC715RV 10 2009 ...
Page 1164: ......
Page 2008: ......