FE03-0110b
13. Install the 5th gear.
Input Shaft 5th Gear Axial Clearance:
0.1-0.50 mm (3.937-19.685 × 10
-3
in)
FE03-0111b
14. Install the 5th gear synchronizer.
Note
The synchronizer is directional, the convex side
should face the rear of the transmission.
FE03-0112b
15. Install the input shaft rear bearing with special tools
GL201-003 and GL201-004.
Input Shaft 4th Gear and 5th Gear Radial Clearance:
≤
0.058 mm (3.346 × 10
-3
in)
Note
The bearing is directional, the transmission fluid seal
side should face the rear of the transmission.
16. Install the input shaft assembly.
17. Install the shift shaft.
18. Install the shift control assembly.
19. Install the transmission.
Transmission / Drive Axle
Manual Transmission
3-93
EC718/EC718RV EC715/EC715RV 10/2009
Summary of Contents for EC715 2009
Page 4: ......
Page 330: ...Next Step 10 End 2 248 Fuel System JL4G18 D Engine EC718 EC718RV EC715 EC715RV 10 2009 ...
Page 1164: ......
Page 2008: ......