FE01-0203b
10. Install the VVT solenoid valve.
11. Install the camshaft position sensor.
12. Install the coolant temperature sensor wiring harness
connector.
13. Install the fuel rail assembly.
14. Install the timing chain.
15. Install the timing chain cover.
16. Install the engine mounting.
17. Install the drive belt.
18. Install the cylinder head cover.
19. Install the ignition coil and ignition wire.
20. Install the exhaust manifold.
21. Install the intake manifold assembly.
22. Install the throttle body.
23. Fill the engine coolant.
24. Install the engine plastic shield.
25. Connect the battery negative cable.
2.6.8.15 Cylinder Head Assembly Removal
and Installation
Removal Procedure:
FE02-0204b
1.
Remove the cylinder head assembly. Refer to
Cylinder Head Assembly Replacement
2.
Remove the valve Lifter.
Engine
Engine Mechanical System JL4G18-D
2-391
EC718/EC718RV EC715/EC715RV 10/2009
Summary of Contents for EC715 2009
Page 4: ......
Page 330: ...Next Step 10 End 2 248 Fuel System JL4G18 D Engine EC718 EC718RV EC715 EC715RV 10 2009 ...
Page 1164: ......
Page 2008: ......