GE Analytical Instruments ©2009
67 of 236
DLM 90488-01 Rev. A
Remove Internal Packing Materials
Some 900 On-Line Analyzers are shipped with packing materials inside the Analyzer case and can
be identified by a sticker that says “Remove” before use. If any packing materials are present,
remove them now.
Step 5: Fill the DI Water Reservoir
Fill the DI water reservoir with DI water, using the squeeze bottle provided in the accessories kit.
1. Fill the water bottle with DI water.
2. Remove the rubber inlet cover on the DI water reservoir.
3. Slide the bottle nozzle into the inlet hole, and gently squeeze the bottle. Be sure to
fill the reservoir until the water reaches the fill line, just below the inlet.
4. Replace the rubber inlet cover. Visually check for leaks from the reservoir after the
reservoir has been filled.
Figure 5: Filling the DI Water Reservoir
Note:
The DI water pump will not be properly primed unless you follow the instructions in
the section called “Powering the Analyzer On” later in this chapter.
Summary of Contents for Sievers 900 Series
Page 10: ...GE Analytical Instruments 2009 10 of 236 DLM 90488 01 Rev A ...
Page 88: ...GE Analytical Instruments 2009 88 of 236 DLM 90488 01 Rev A ...
Page 122: ...GE Analytical Instruments 2009 122 of 236 DLM 90488 01 Rev A ...
Page 159: ...GE Analytical Instruments 2009 159 of 236 DLM 90488 01 Rev A ...
Page 161: ...GE Analytical Instruments 2009 161 of 236 DLM 90488 01 Rev A ...
Page 165: ...GE Analytical Instruments 2009 165 of 236 DLM 90488 01 Rev A ...
Page 167: ...GE Analytical Instruments 2009 167 of 236 DLM 90488 01 Rev A ...
Page 170: ...GE Analytical Instruments 2009 170 of 236 DLM 90488 01 Rev A ...
Page 194: ...GE Analytical Instruments 2009 194 of 236 DLM 90488 01 Rev A ...
Page 218: ...GE Analytical Instruments 2009 218 of 236 DLM 90488 01 Rev A ...
Page 235: ...Notes GE Analytical Instruments 2009 235 of 236 DLM 90488 01 Rev A 236 ...
Page 236: ...Notes GE Analytical Instruments 2009 236 of 236 DLM 90488 01 Rev A 236 ...