GE Analytical Instruments ©2009
185 of 236
DLM 90488-01 Rev. A
Figure 35: Resin Bed Connections
Resin Bed Replacement with a Brass-Colored Bracket
1. If the Analyzer is taking measurements, press the
Stop Analysis
button.
2. Turn off the Analyzer by using the main power switch.
3. Remove the top of the water bottle and empty out any water in the bottle. Keep the water
bottle available.
4. Remove the new resin bed from the packaging. The resin bed comes with a red plug
inserted into the port at the bottom of the bed; remove this plug and keep it available.
5. Open the Analyzer front panel by turning the two latches and swinging the panel door to
the left.
6. Locate the resin bed at the top left side of the Analyzer, just to the right of the reagent
enclosure. The resin bed sits slightly in front and to the left of the DI reservoir (refer to
Summary of Contents for Sievers 900 Series
Page 10: ...GE Analytical Instruments 2009 10 of 236 DLM 90488 01 Rev A ...
Page 88: ...GE Analytical Instruments 2009 88 of 236 DLM 90488 01 Rev A ...
Page 122: ...GE Analytical Instruments 2009 122 of 236 DLM 90488 01 Rev A ...
Page 159: ...GE Analytical Instruments 2009 159 of 236 DLM 90488 01 Rev A ...
Page 161: ...GE Analytical Instruments 2009 161 of 236 DLM 90488 01 Rev A ...
Page 165: ...GE Analytical Instruments 2009 165 of 236 DLM 90488 01 Rev A ...
Page 167: ...GE Analytical Instruments 2009 167 of 236 DLM 90488 01 Rev A ...
Page 170: ...GE Analytical Instruments 2009 170 of 236 DLM 90488 01 Rev A ...
Page 194: ...GE Analytical Instruments 2009 194 of 236 DLM 90488 01 Rev A ...
Page 218: ...GE Analytical Instruments 2009 218 of 236 DLM 90488 01 Rev A ...
Page 235: ...Notes GE Analytical Instruments 2009 235 of 236 DLM 90488 01 Rev A 236 ...
Page 236: ...Notes GE Analytical Instruments 2009 236 of 236 DLM 90488 01 Rev A 236 ...