The following table gives an overview of steps taken into account for
calculating the average task duration.
Step
included
Explanation
Server shutdown
no
Shutdown time depends on hardware and
software configuration and may vary
significantly.
Software tasks necessary before
maintenance, see
.
Rack removal,
disassembly
yes
Making the server available, removing the
server from the rack (if applicable).
Transport
no
Transporting the server to the service table
(where required) depends on local
customer conditions.
Maintenance
procedures
yes
Maintenance procedures including
preliminary and concluding software tasks.
Transport
no
Returning the server to its installation site
(where required) depends on local
customer conditions.
Assembly, rack
installation
yes
Reassembling the server, installing the
server in the rack (if applicable).
Starting up
no
Booting time depends on hardware and
software configuration and may vary
significantly.
Table 1: Calculation of the average task duration
2.4
Tools you need at hand
When preparing the maintenance task, ensure that all required tools are
available. You will find a list of required tools at the beginning of each
procedure.
Before you start
TX1320 M5
Upgrade and Maintenance Manual
25
Summary of Contents for PRIMERGY TX1320 M5
Page 70: ...Basic hardware procedures 70 Upgrade and Maintenance Manual TX1320 M5 ...
Page 132: ...Power supply unit PSU 132 Upgrade and Maintenance Manual TX1320 M5 ...
Page 180: ...Fans 180 Upgrade and Maintenance Manual TX1320 M5 ...
Page 266: ...Accessible drives 266 Upgrade and Maintenance Manual TX1320 M5 ...
Page 272: ...Front panel 272 Upgrade and Maintenance Manual TX1320 M5 ...
Page 280: ...Front USB connector 280 Upgrade and Maintenance Manual TX1320 M5 ...
Page 298: ...Dust cover 298 Upgrade and Maintenance Manual TX1320 M5 ...
Page 346: ...System board and components 346 Upgrade and Maintenance Manual TX1320 M5 ...
Page 402: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...