34
Festo — MSE6-E2M — 2022-08d
Commissioning
1
2
Fig. 17: Commissioning steps
1
Step 1: check the connected pneumatic
application
2
Step 2: commissioning on bus node with
testing of the address allocation
Preparing for commissioning
1. Check the pneumatic tubing.
2. Check the electrical wiring.
3. Check the earth terminal.
4. Check the settings of the DIL switches.
The characteristics of the energy efficiency module can be adapted to various requirements.
You can carry out important settings as follows:
–
with the DIL switch directly on the bus node.
–
with parameterisation.
The energy efficiency module is delivered with preset DIL switches and parameters.
Information on DIL switches
NOTICE
Unauthorised Access to the Device Can Cause Damage or Malfunction.
• When connecting the device to a network, protect the network from unauthorised access.
Standards for security in information technology can be used for network protection measures, e.g.
IEC 62443, ISO/IEC 27001.