Festo — MSE6-E2M — 2022-08d
Commissioning
49
Configuration with CPX-FMT
1. Start the ‘Festo Maintenance Tool’ software.
2. Establish the connection between the energy efficiency module and the ‘Festo Maintenance Tool’
software.
3. Activate the online function with the ‘Online’
>
‘Online’ command.
4. Set the desired parameters.
5. Save the configuration for use with ‘Rockwell Studio 5000’ controller software as an L5K file with
the ‘File’
>
‘Export’
>
‘RSLogix (.L5K)’ command.
Importing the configuration into the Rockwell Studio 5000 controller software
1. Open the saved L5K configuration file with the ‘File’
>
‘Open’ command.
2. Confirm the selection by clicking on the ‘Open’ button.
3. Select the directory and name for the imported file.
4. Confirm the entry by clicking on the ‘Import’ button.
5. Select the control in the ‘Change Controller Type’ dialogue.
6. Confirm the selection by clicking on the ‘OK’ button.
Ä
The configuration, L5K file, is imported into a new project as an Ethernet module.
Integrating the configuration into an existing automation project
1. Copy the imported Ethernet module by right-clicking on ‘Ethernet-Modul’ under ‘Ethernet’,
e.g. ETHERNET MODULES Festo_CPX and the ‘Copy’ command.
2. Open the desired project for integration.
3. Integrate the Ethernet module into the project with by right-clicking on ‘Ethernet’ and ‘Paste’.
Ä
All settings are applied to the project.
Transmit configuration
•
Send the configuration to the controller.
8.4.5
Faultless commissioning, normal operating status
After faultless commissioning, specific LED displays on the bus node light. The other LEDs are for
diagnostics and error handling
LED displays
Description
Operating status
PS
PL
SF
MS
NS
TP1
M
TP2
The following LEDs are green:
–
PS
–
PL
–
MS
–
NS
–
TP1
–
TP2
Normal, no error
Tab. 34: Normal operating status of the energy efficiency module on the bus node CPX-FB36
LEDs TP1 and TP2 are steady or flashing if the port is in use.
–
A steady light means the network connection is OK.
–
Flashing means data transfer is in progress.
The SF LED is not on.