Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide
Summit Switch Models
Redundant Power Supply
Summit 300-24 switch software is responsible for managing overall power consumption to ensure that it
does not attempt to deliver more power than is available. The Summit 300-24 has sufficient power
budget to provide full 15.4 watts power on all 24 ports simultaneously.
The Extreme Networks External Power Supply 45019 (EPS-LD) is an optional external power supply
that provides redundant power for the Summit 300-24 switch. The EPS-LD provides 465 W total power
with 375 W dedicated for PoE applications. For instructions to install and connect the EPS-LD, see
“Installing or Removing an External Power Supply 45019 (EPS-LD)” on page 118.
To determine the wattage of installed power supplies when the power supplies are in 1-to-1 redundant
mode, use the
show inline-power
command. When the power supplies are in PoE mode, most of the
power is dissipated externally to the switch by way of the inside attached powered devices.
Summit 300-48 Switch
The Summit 300-48 is 2U high and provides 48 autosensing10BASE-T/100BASE-TX ports using RJ-45
connectors. The Summit 300-48 also provides four combination uplink ports implemented as either
10/100/1000BASE-T ports using RJ-45 connectors or optical ports using mini-GBICs. The optical ports
are also combination uplink ports. For further information, see “Summit 300 Automatic Failover” on
page 74.
The Summit 300-48 requires a minimum software level of ExtremeWare 6.2a.1.2.
The Summit 300-48 is shown in Figure 23 and Figure 24.
Figure 23:
Summit 300-48 switch
front view
The front panel of the Summit 300-48 switch includes LEDs, fixed 10BASE-T/100BASE-TX ports,
unpopulated ports for installing mini-GBICs, and a console port.
LB48001
10/100 Mbps ports with PoE
Expansion module slot
Console port
Mini-GBIC ports
10/100/1000 Mbps ports
Summary of Contents for Summit 200-24
Page 18: ...18 Extreme Networks Consolidated i and e Series Hardware Installation Guide Preface...
Page 19: ...Part 1 Common Features...
Page 20: ......
Page 25: ...Part 2 Site Planning...
Page 26: ......
Page 56: ...56 Extreme Networks Consolidated i and e Series Hardware Installation Guide Site Preparation...
Page 57: ...Part 3 Summit Switch...
Page 58: ......
Page 137: ...Part 4 Alpine Switch...
Page 138: ......
Page 213: ...Part 5 BlackDiamond Switch...
Page 214: ......
Page 303: ...Part 6 Switch Operation...
Page 304: ......
Page 307: ...Part 7 Appendixes...
Page 308: ......
Page 386: ...386 Extreme Networks Consolidated i and e Series Hardware Installation Guide...