368
Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide
Installing GBICs and Mini-GBICs
NOTE
Disconnect the fiber-optic cable from a mini-GBIC before removing the mini-GBIC from the switch.
To remove a mini-GBIC similar to the one labeled “Module A” in Figure 180, press and hold the black
plastic tab at the bottom of the connector to release the mini-GBIC, and pull the mini-GBIC out of the
SFP receptacle.
To remove a mini-GBIC similar to the one labeled “Module B” in Figure 180, rotate the front handle and
pull the mini-GBIC out of the SFP receptacle.
Summary of Contents for Summit 200-24
Page 18: ...18 Extreme Networks Consolidated i and e Series Hardware Installation Guide Preface...
Page 19: ...Part 1 Common Features...
Page 20: ......
Page 25: ...Part 2 Site Planning...
Page 26: ......
Page 56: ...56 Extreme Networks Consolidated i and e Series Hardware Installation Guide Site Preparation...
Page 57: ...Part 3 Summit Switch...
Page 58: ......
Page 137: ...Part 4 Alpine Switch...
Page 138: ......
Page 213: ...Part 5 BlackDiamond Switch...
Page 214: ......
Page 303: ...Part 6 Switch Operation...
Page 304: ......
Page 307: ...Part 7 Appendixes...
Page 308: ......
Page 386: ...386 Extreme Networks Consolidated i and e Series Hardware Installation Guide...