236
Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide
Installing a BlackDiamond 6800 Series Switch Chassis
NOTE
Do not use the fan tray handle to lift and insert the chassis into the rack.
5
While holding the empty chassis, secure it with a minimum of eight suitable screws.
•
BlackDiamond 6816—see Figure 131
•
BlackDiamond 6808—see Figure 132
•
BlackDiamond 6804—see Figure 133
Figure 131:
Securing the BlackDiamond 6816 chassis to a rack
BD_rack16
1
2
3
4
5
6
7
8
A
B
C
D
9
10
11
12
13
14
15
16
Summary of Contents for Summit 200-24
Page 18: ...18 Extreme Networks Consolidated i and e Series Hardware Installation Guide Preface...
Page 19: ...Part 1 Common Features...
Page 20: ......
Page 25: ...Part 2 Site Planning...
Page 26: ......
Page 56: ...56 Extreme Networks Consolidated i and e Series Hardware Installation Guide Site Preparation...
Page 57: ...Part 3 Summit Switch...
Page 58: ......
Page 137: ...Part 4 Alpine Switch...
Page 138: ......
Page 213: ...Part 5 BlackDiamond Switch...
Page 214: ......
Page 303: ...Part 6 Switch Operation...
Page 304: ......
Page 307: ...Part 7 Appendixes...
Page 308: ......
Page 386: ...386 Extreme Networks Consolidated i and e Series Hardware Installation Guide...