370
Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide
Installing the Summit Option Card and XENPAK Modules
Installing the Summit Option Card
CAUTION
The Summit option card cannot be hot-swapped. Before installing the Summit option card in the Summit
400-48t switch, you must turn off the switch. Use only XENPAK modules approved by Extreme
Networks.
To install the Summit option card:
1
If you are installing a Summit XGM-2xn Option Card, upgrade the software in your switch to
ExtremeWare 7.4 (or later).
2
Disconnect the AC power from the Summit switch.
3
Using a number 1 Phillips screwdriver, remove the filler panel from the option slot on the back of
the switch (Figure 181). Save the screws for re-use.
Figure 181:
Removing the option slot filler panel
4
Align the edges of the sheet metal with the card guides, and carefully slide the option card into the
switch housing until the connectors engage and the option card is flush with the back panel of the
switch (Figure 182).
Figure 182:
Installing the Summit XGM-2xn option card
5
Using the screws from the cover plate, secure the option card to the back panel of the switch.
ES4K041
Filler Panel
ES4K042
Summit Option
Card
Summary of Contents for Summit 200-24
Page 18: ...18 Extreme Networks Consolidated i and e Series Hardware Installation Guide Preface...
Page 19: ...Part 1 Common Features...
Page 20: ......
Page 25: ...Part 2 Site Planning...
Page 26: ......
Page 56: ...56 Extreme Networks Consolidated i and e Series Hardware Installation Guide Site Preparation...
Page 57: ...Part 3 Summit Switch...
Page 58: ......
Page 137: ...Part 4 Alpine Switch...
Page 138: ......
Page 213: ...Part 5 BlackDiamond Switch...
Page 214: ......
Page 303: ...Part 6 Switch Operation...
Page 304: ......
Page 307: ...Part 7 Appendixes...
Page 308: ......
Page 386: ...386 Extreme Networks Consolidated i and e Series Hardware Installation Guide...