Summit 300 Series Switch Specifications
Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide
325
Table 75 lists the specifications for the EPS-160 external power supply for the Summit 400-48t and
Summit 400-24t switches.
Electromagnetic Interference/ Compatibility (EMI/EMC)
Certifications and Standards
North America EMC for ITE
•
FCC CFR 47 part 15 Class A
•
ICES-003 Class A
European EMC standards for ITE
•
EN 55022:1998 Class A
•
EN 55024:1998 Class A (includes IEC 61000-4-2, 3, 4, 5, 6, 8, 11)
•
EN 61000-3-2,3 (Harmonics & Flicker)
•
ETSI EN 300 386:2001 (EMC Telecommunications)
•
89/336/EEC EMC Directive
International EMC Certifications
•
CISPR 22:1997 Class A
•
CISPR 24:1997 Class A
•
VCCI Class A (Japan)
•
AS/NZS 3548 (Australia)
•
CNS 13438:1997 Class A (BSMI-Taiwan)
•
MIC Mark (Korea)
Environmental Operating Conditions
Operating Temperature
0° to 40° C (32° to 104° F)
Storage Temperature
-40° to 70° C (-40° to 158° F)
Operating Humidity
10% to 95% relative humidity, noncondensing
Operational Shock
30 m/s2 (3g)
Standards
EN/ETSI 300 019-2-1 v2.1.2 – Class 1.2 Storage
EN/ETSI 300 019-2-2 v2.1.2 – Class 2.3 Transportation
EN/ETSI 300 019-2-3 v2.1.2 – Class 3.1e Operational
EN/ETSI 300 753 (1997-10) – Acoustic Noise
ASTM D5276 Drop Packaged
ASTM D3580 Random Vibration Packaged 1.5G
Table 75:
EPS-160 AC Power Supply Specifications
AC Input Specifications
Input Voltage
100 VAC to 240 VAC, 50 Hz to 60 Hz
Current Rating
4A at 100 VAC, 2A at 240 VAC
Maximum Inrush
Current
30A at 100 VAC, 50A at 50 VAC
Output Specifications
+12V DC, maximum output current 13A
+5V DC, maximum output current 1.5A
Table 74:
Summit 300-48 internal power supply environmental and safety specifications (continued)
Summary of Contents for Summit 200-24
Page 18: ...18 Extreme Networks Consolidated i and e Series Hardware Installation Guide Preface...
Page 19: ...Part 1 Common Features...
Page 20: ......
Page 25: ...Part 2 Site Planning...
Page 26: ......
Page 56: ...56 Extreme Networks Consolidated i and e Series Hardware Installation Guide Site Preparation...
Page 57: ...Part 3 Summit Switch...
Page 58: ......
Page 137: ...Part 4 Alpine Switch...
Page 138: ......
Page 213: ...Part 5 BlackDiamond Switch...
Page 214: ......
Page 303: ...Part 6 Switch Operation...
Page 304: ......
Page 307: ...Part 7 Appendixes...
Page 308: ......
Page 386: ...386 Extreme Networks Consolidated i and e Series Hardware Installation Guide...