
Duplication prohibited
AS32M
Environnement
S.A
DECEMBER 2013
3–9
3.1.3
PRELIMINARY TESTS
Perform the following system checks when warm-up is complete:
Chamber parameters and MUX signals
Connect the analyzer to zero air and verify that the chamber parameters and the MUX signals
are in conformity with the values noted in the test report sent with the unit to the customer.
Refer to section 3.4. CALIBRATION for more information about how to connect and generate
zero air.
For more information about this procedure, refer to sections 3.2 PROGRAMMING THE
AS32M and 3.3.6. TESTS.
Calibration
The analyzer is calibrated in the factory before delivery.
To carry out a calibration check, refer to section 3.4. CALIBRATION.
Summary of Contents for AS32M
Page 8: ...EnvironnementS A AS32M Duplication prohibited MAY 2013 0 8 Page intentionally left blank...
Page 26: ...EnvironnementS A AS32M Duplication prohibited AUGUST 2013 2 2 Page intentionally left blank...
Page 38: ...EnvironnementS A AS32M Duplication prohibited DECEMBER 2013 2 14 Page intentionally left blank...
Page 104: ...EnvironnementS A AS32M Duplication prohibited DECEMBER 2013 3 66 Page intentionally left blank...
Page 106: ...EnvironnementS A AS32M Duplication prohibited AUGUST 2013 4 2 Page intentionally left blank...
Page 111: ...Duplication prohibited AS32M EnvironnementS A AUGUST 2013 4 7 Page intentionally left blank...
Page 126: ...EnvironnementS A AS32M Duplication prohibited AUGUST 2013 5 2 Page intentionally left blank...
Page 133: ...Duplication prohibited AS32M EnvironnementS A DECEMBER 2013 5 9 Page intentionally left blank...
Page 140: ...EnvironnementS A AS32M Duplication prohibited DECEMBER 2013 5 16 Page intentionally left blank...
Page 142: ...EnvironnementS A AS32M Duplication prohibited AUGUST 2013 6 2 Page intentionally left blank...
Page 160: ...EnvironnementS A ESTEL Board Duplication prohibited JUNE 2009 18 Page intentionally left blank...