Emerson Process Management GmbH & Co. OHG
8-42
X-STREAM XE
Instruction Manual
HASXEE-IM-HS
10/2012
8.4 Troubleshooting on Components
Step 5:
To
adjust the physical span
:
Apply span gas to the analyzer.
Do not disconnect the DVM:
P4.5
Raw signal (+)
P4.15
Bridge voltage (-); GND
CAUTION!
Do not short-circuit pins!
Adjust the voltage to
10V
utilizing
R119
.
If 10V is not within the adjustable
range, it is necessary to change the
signal amplification with
solder bridge
LB3
:
Step 6:
Now once more check the zero point:
Apply zero gas to the analyzer.
Do not disconnect the DVM:
The voltage should be
0 V ± 500 mV.
If it does not, repeat from step 3!
P4.15
P4.5 Raw
For an amplification
factor of
close
20
1-5
150
3-5
300
4-5
500
2-3-4-5
LB3
R119
P4
Summary of Contents for Rosemount X-Stream Series
Page 535: ......