Emerson Process Management GmbH & Co. OHG
5-1
X-STREAM XE
Instruction Manual
HASXEE-IM-HS
10/2012
5
Startup
Chapter 5
Startup
Once the unit has been unpacked and in
-
stalled, it is recommended to first check the
settings, and if necessary adjust them to the
user’s needs. e.g:
•
What hardware is installed?
•
Is the unit configured to your needs
(alarms, inputs, outputs, etc.)
In order for the information in this chapter
to be of any relevence, the unit must have
been installed according to the instructions
in chapter 4.
5.1 Introduction
The following pages describe how to navigate
through the menus and what is to be observed
when configuring the unit. For the first startup
after installation, follow the step-by-step in
-
structions for navigating the menus, allowing
you to familiarise yourself with the unit and its
software, and if necessary adjust the settings
to your own requirements.
OPERATION AT LOW TEMPERATURES
When operating an instrument at temperatures below 0 °C (32 °F), do NOT
apply gas nor operate the internal pump before the warmup time has elapsed!
Violation may result in condensation inside the gas paths or damaged pump
diaphragm!
Before starting to follow the steps described
on the next pages, we recommend to carry
out a leak test for the gas paths (containment
system), to ensure the instrument is in proper
condition. For instructions on how to carry out
a leak test:
Summary of Contents for Rosemount X-Stream Series
Page 535: ......