Configuring the Card
Eaton Network Card-MS User’s Guide P-164000100—Rev 1
www.eaton.com/powerquality
28
l
Delayed, safe power down & reboot:
This is the same switch off and then on sequence as for the
Safe power
down & reboot command
, but postponed by the number of seconds programmed in the
Off Delay
parameter.
l
Delayed On:
This is the same switch on sequence as for the
Immediate On
command, but postponed by the
number of seconds programmed in the
On Delay
parameter.
Selecting
Save
saves the
Off Delay
,
Toggle Duration
, and
On Delay
parameters on the card.
UPS Weekly Schedule Programming
Select
Weekly Schedule
from the menu bar to set up the timing of specific weekly actions (see Figure 22).
Figure 22. Weekly Schedule Page
The weekly schedule enables the administrator to optimize power consumption or program a reboot of the
protected equipment at a set time.
In a shutdown sequence, the Eaton UPS Management Software connected to the card is informed, ensuring
that each machine is shut down correctly before the UPS output is switched off. You can program up to seven
UPS shutdown sequences in one week, with a minimum shutdown delay of 30 minutes.
The On/Off sequences are valid only if the card’s time has been set properly.
NOTE
For security purposes, the administrator must click
Save
and enter the admin user
name and password to save modifications or run commands. The default user name
and password are both
admin
.
NOTE
UPS configuration can prevent the shutdown and restart commands from running
properly. Refer to the UPS user’s guide for more information.
NOTE
For security purposes, the administrator must click
Save
and enter the admin user
name and password to save modifications or run commands. The default user name
and password are both
admin
.