Operating Manual
© Dürr Systems AG
66 / 156
EcoBell2 SL EC - Rotating Atomizer with External Charging
Installation and assembly
Document No.: MRA00001EN
Version:: 07
•
As of:: 01/2020
A T T E N T I O N
Risk of property damage and production disruption
In case of wrong assembly, shaping air ring and bell disk can rub
against each other. Shaping air ring and bell disk can be damaged.
Check the distance between shaping air ring and bell disk. The bell
disk should not rub against the shaping air ring.
- Check the painting distance (200 mm ± 20 mm.
- Check distance of the electrode tips to grounded parts (at least
400 mm).
- Cable for potential equalization wire connected to the flange.
- High voltage line connected to the flange.
5.2.8.2
Pneumatic supply
- Ensure quality of compressed air.
- Check minimum pressure and maximum pressure.
5.2.8.3
Media Lines
- Lines must be clean and free of debris.
- Viscosity of the paint
- Paint temperature
- Pressure of the rinsing agent
Pos: 35 /INP/ Bell2/06_00 Be trieb @ 52\mod_1461591579287_20.docx @ 594583 @ 1 @ 1