Operating Manual
© Dürr Systems AG
EcoBell2 SL EC - Rotating Atomizer with External Charging
Faults
Document No.: MRA00001EN
Version:: 07
•
As of:: 01/2020
137 / 156
9.8
Replacing the hose at the flange assembly
A T T E N T I O N
Risk of damage to property and production disruption
Hoses not meeting the Dürr-quality requirements may cause
production disruptions.
Only use the original Dürr hoses. The original hoses are specially
designed to meet the requirements of the atomizer.
Fig. 95: Hose connection on the flange
1
Hose
2
Hose connection
3
Hexagon socket
4
Flange assembly
Ensure the following when working on the hose connections:
- Do not bend the hoses.
- Observe minimum bend radius of the hoses.
- Do not twist the hoses.
- Coat the hoses with a thin layer of Vaseline.
Requirements:
- Atomizer was removed from the flange assembly.
- The other end of the defective hose is free.
The hose connections are screwed into the flange assembly.
• Unscrew the defective hose from the flange assembly with a
hexagon socket.
• Remove the hose.
• Insert new hose with hose connection in the flange assembly.
• Screw hose connection into the flange packet with a tightening
torque of 1.5 Nm.
Pos: 69 /INP/ Bell2/08_13 Wide rstandsmessung_AA @ 40\mo d_1411562898187_20.docx @ 505859 @ 2 @ 1