Operating Manual
© Dürr Systems AG
EcoBell2 SL EC - Rotating Atomizer with External Charging
Faults
Document No.: MRA00001EN
Version:: 07
•
As of:: 01/2020
121 / 156
Fig. 69: Markings
• Set the turbine in the valve casing.
• Place the swivel nut.
• Tighten the swivel cap with the specialized 8 Nm tool.
Fig. 70: Tightening the screw cap
After installation of the turbine, the position of the nozzle must be
checked.
9.2.3
Checking the position of the nozzle
• Instead of the bell disk, screw the test sleeve into the shaft.
• Visually inspect the centric position of the nozzle.