6.6
Checks during operation
The following table contains the procedures for checking and testing
the atomizer and flange package:
Interval
Component
Check/Test
Daily before
Start of operation
Bell disk
Soiling of the entire bell disk
(inside and outside).
Damage and wear on the
edge of the bell disk.
Shaping air ring
Dirt and damage, in
particular in the region of the
bores.
Atomizer body
Atomizer body mounted on
stop. The bell disk should not
touch the shaping air ring.
Turbine
Testing function of the
turbine:
easy and uniform rotation of
the shaft by hand with active
engine bearing air.
Nozzle
Soiling and damages.
Complete
Atomizer
Leaks,
dirt on atomizer body,
condition of hoses and
cables on atomizer.
1 x hourly
Complete
Atomizer
Soiling.
Minimum
1 x a week
Bell disk
Unscrew and disassemble.
Clean bell disk and
thoroughly examine
condition.
1 x a week
Flange package
Check the free movement of
the clamping bolt in the
flange package.
After
dismantling/cleaning
Atomizer
body/bell disk
Check distance between
edge of bell disk and shaping
air ring. The bell disk must
not rub against the shaping
air ring.
After 2000 operating
hours
Turbine
Replace the contact ring on
the turbine with a new
contact ring.
Pos: 42 /INP/ Bell2/06_06_01 Prüfungen AA @ 40\mod_1409920416059_20.docx @ 498229 @ @ 1