Operating Manual
© Dürr Systems AG
EcoBell2 SL EC - Rotating Atomizer with External Charging
Installation and assembly
Document No.: MRA00001EN
Version:: 07
•
As of:: 01/2020
57 / 156
Fig. 22: Attaching flange assembly
1
Fastening screws on the flange assembly
• Tighten flange assembly with four screws (1) to the atomizer mount
or the elbow.
5.2.3.2
Cable and hose routing
The lines and hoses of the flange assembly must be installed inside
and outside the cabin in covered housings.
W A R N I N G
Danger from explosive atmospheres
Lines and hoses can lead to electrostatic generation.
Note traverse rules.
The traverse of cables and hoses will affect electrostatic charging.
Below you will find the rules that must be observed when laying the
hoses and lines.
Laying inside the cabin
Respect the local or national traverse rules.