Operating Manual
© Dürr Systems AG
54 / 156
EcoBell2 SL EC - Rotating Atomizer with External Charging
Installation and assembly
Document No.: MRA00001EN
Version:: 07
•
As of:: 01/2020
5
Installation and assembly
5.1
Installation illustration
Fig. 19: Configuration example
1
Control system
7
Pump
2
Emergency off
8
Color changer
3
Atomizer
9
Fire detector
4
Work piece
10
Paint supply
5
Technical ventilation
11
Power and air supply
6
Safety door
The schematic shows some options of atomizer installation. This is
not an image of your configuration.
Your system must be set up according to your requirements. Contact
the Service of Dürr System to assist.
5.2
Assembly
Assembly can be done by the technical personnel of Dürr Systems.
Please contact our customer service If you have any questions about
the assembly. Please refer the notes in the chapter “Service” of this
guide.