9
DBC 130II
DBC130II ISE41
2. Foundation work
※
Foundation diagram: Use only the foundation diagram provided by the
salesperson.
- foundation diagram : “S/O NO._Serial No_drawing no”
- Example of foundation diagram: 201077848_MB0003-000084_BG6C21601C
☞
(Note)
The foundation diagrams illustrated in this manual are for reference only
2.1 Foundation work timing and post checkpoints
1) It is recommended to take at least a two-month schedule from completion of the
foundation work to completion of the installation.
▪
It should take at least one month to cure the concreted surface.
2) After completion of the foundation work, measure each checkpoint on the foundation
and, if a problem is found, take an appropriate action (mostly repair) before the arrival of
the machine.
2.2 Foundation work for installing the machine
1) Foundation diagram
(Subject to change without notice for reasons of enhanced machinery or engineering
changes.)
※
40 Tool Magazine
Summary of Contents for DBC 130 II
Page 1: ...Installation Manual DBC 130Ⅱ Machine Tools ...
Page 2: ......
Page 7: ...5 DBC 130II DBC130II ISE41 Ref 2 Right View Ref 3 Top View ...
Page 9: ...7 DBC 130II DBC130II ISE41 Ref 6 Top view of machine to install semi splash guard on Optional ...
Page 10: ...8 DBC 130II DBC130II ISE41 Ref 7 Top view of machine to install APC on Optional ...
Page 12: ...10 DBC 130II DBC130II ISE41 60 Tool Magazine ...
Page 60: ...58 DBC 130II DBC130II ISE41 Z axis ...
Page 121: ...119 DBC 130II DBC130II ISE41 19 Installation Complete ...