![Doosan DBC 130 II Installation Manual Download Page 62](http://html.mh-extra.com/html/doosan/dbc-130-ii/dbc-130-ii_installation-manual_2521470062.webp)
60
DBC 130II
DBC130II ISE41
4) Air Hose
7.6 Connecting the tool magazine wires and hydraulic hoses
Put the tool magazine on the top of ATC base, or move the wires and hoses close to the
base and plug in the connectors and connect the hoses: hydraulic, lubricant and air.
Scale Air
Hyd. Line(P)
Hyd. Line(T)
Air Line
Lub. Line
TMG
용
전선
Connector
Summary of Contents for DBC 130 II
Page 1: ...Installation Manual DBC 130Ⅱ Machine Tools ...
Page 2: ......
Page 7: ...5 DBC 130II DBC130II ISE41 Ref 2 Right View Ref 3 Top View ...
Page 9: ...7 DBC 130II DBC130II ISE41 Ref 6 Top view of machine to install semi splash guard on Optional ...
Page 10: ...8 DBC 130II DBC130II ISE41 Ref 7 Top view of machine to install APC on Optional ...
Page 12: ...10 DBC 130II DBC130II ISE41 60 Tool Magazine ...
Page 60: ...58 DBC 130II DBC130II ISE41 Z axis ...
Page 121: ...119 DBC 130II DBC130II ISE41 19 Installation Complete ...