Page 75
AIM 2 Operation Manual
5. Use the left/right arrow buttons to position the
image of the AIM under the location where you
are testing.
6.
Connect the AIM ODU F connector at the
location in the distribution network where you
want to test. Then press
NEXT
to go to the
EIV
PLUS TEST
screen.
To test between the ODU and the multiswitch,
disconnect the cable connecting the ODU to
the multiswitch and connect it to the AIM’s ODU
F connector.
If the installation includes two ODUs, the
EIV
PLUS
screen appears. Highlight the ODU for
which you want to perform EIV Plus and press
SELECT
to go to the
EIV PLUS TEST
screen.
Summary of Contents for Advanced Installation Meter 2
Page 6: ...Page 6 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 12: ...Page 12 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 14: ...Page 14 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 44: ...Page 44 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 50: ...Page 50 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 60: ...Page 60 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 66: ...Page 66 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 92: ...Page 92 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 104: ...Page 104 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 108: ...Made in U S A ...