Page 88
AIM 2 Operation Manual
5. Use the left/right arrow buttons to position the
image of the AIM under the location where you
are testing.
6.
Connect the AIM in series with the equipment
at the location where you want to test.
To test between the ODU and the
multiswitch,
disconnect the cable connecting the ODU to
the multiswitch and connect it to the AIM’s ODU
F connector. Then connect the AIM’s IRD F
connector to the multiswitch.
7. Press
NEXT
and wait briefly for the results of
the test.
8. On the
IN-LINE TEST RESULTS
screen,
review the results of the test. The screen
indicates whether the test passed or failed. The
screen also shows:
• Voltage
supplied (in volts).
• Current
supplied (in milliamps).
• If present, amplitude of the 22 kHz
tone
.
• Indication as to whether
DiSEqC
commands are being received by the
multiswitch (
MSW
) and
BBC
.
9.
Troubleshoot any problems following the instructions provided by DIRECTV.
10. Press
DONE
to return to the
TEST
screen.
As messages are received from the multiswitch (MSW) and
BBC, the multiswitch port and BBC frequency range flash
bold. If no messages are received, “N/A” appears.
Summary of Contents for Advanced Installation Meter 2
Page 6: ...Page 6 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 12: ...Page 12 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 14: ...Page 14 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 44: ...Page 44 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 50: ...Page 50 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 60: ...Page 60 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 66: ...Page 66 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 92: ...Page 92 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 104: ...Page 104 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 108: ...Made in U S A ...