Operation & Maintenance Manual
Section5-Operation Instruction
Dingli Machinery
5-10
7)
Position
Power/Emergency Stop
switch to the off position.
5.10 Oscillating Axle Lockout Test (If Equipped)
LOCKOUT SYSTEM TEST MUST BE PERFORMED QUARTERLY, ANY
TIME A SYSTEM COMPONENT IS REPLACED, OR WHEN IMPROPER
SYSTEM OPERATION IS SUSPECTED.
Refer to
Section 3.3
, Oscillating Axle Lockout Test (If Equipped) for procedure.
5.11 Shut Down and Park
1.
Drive machine to a reasonably well protected area.
2.
Be sure the main boom is fully retracted and lowered over rear drive axle.
3.
Remove all load and allow engine to operate 3-5 minutes at LOW setting to permit
reduction of internal engine temperatures.
4.
At Ground Controls, turn KEY SELECT switch to OFF position. Push in the Emergency
Stop. Remove key.
5.
If necessary, cover Platform Control console to protect instruction placards, warning
decals and operating controls from hostile environment.
5.12 LIFTING AND TIE DOWN
Lifting
1.
Refer to the Serial Number Tag, to make sure the Gross Vehicle Weight.
2.
Place the boom in the stowed position.
3.
Remove all loose items from the machine.
4.
Properly adjust the rigging to prevent damage to the machine and so the machine remains
level.
If it becomes necessary to lift the machine using an overhead or mobile crane, it is very
important that the lifting devices are attached only to the designated lifting eyes. (See Figure
5-3. Lifting Diagram)
NOTE: Lifting eyes are provided at the front and rear in the frame slab. Each of the four
chains or slings used for lifting machine must be adjusted individually so machine remains
level when elevated.
Tie Down
When transporting machine, boom must be in the stowed mode and
machine securely tied down to truck or trailer deck. Four tie down eyes are
provided in the frame slab, one at each corner of the machine. (See Figure
5-3. and Figure 5-4.)
Summary of Contents for BA14J-AWD
Page 1: ...Operation Maintenance Manual Table of Contents Dingli Machinery i Series 1 ...
Page 51: ...Operation Maintenance Manual Section4 Machine Controls and Indicators Dingli Machinery 4 17 ...
Page 52: ...Operation Maintenance Manual Section4 Machine Controls and Indicators Dingli Machinery 4 18 ...
Page 53: ...Operation Maintenance Manual Section4 Machine Controls and Indicators Dingli Machinery 4 19 ...
Page 84: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 2 ...
Page 85: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 3 ...
Page 86: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 4 ...
Page 87: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 5 ...
Page 88: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 6 ...
Page 89: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 7 ...
Page 90: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 8 ...
Page 91: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 9 ...
Page 92: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 10 ...
Page 93: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 11 ...
Page 94: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 12 ...
Page 95: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 13 ...