Operation & Maintenance Manual
Section3-User Responsibility, Machine
Preparation, and Inspection
Dingli Machinery
3-5
Platform
1)
Check platform and control console for damage, loose or missing parts, and security.
2)
Check control switches and levers for damage, loose or missing parts and security.
Assure that levers function properly.
3)
Check control switches, levers and electrical connections for tightness and evidence of
corrosion, and wiring for defects and chafing damage. Assure that switches function
properly.
4)
Check access gate hinges, stop, and latch for proper operation, damage and security.
5)
Check platform rotator mechanism for proper operation, damage, security. Check
hydraulic lines for leakage, damage and security.
NOTE: Check all DANGER, WARNING, CAUTION and INSTRUCTION placards for
legibility and security on the entire machine.(refer to section 4.4 Placards and Decals)
Torque Requirements
The Reference Torque Value for Metric Thread Table (Figure 2-6.) consists of standard
Metric bolts and Nuts torque values based on bolt diameter and grade, also specifying dry and
wet torque values in accordance with recommended shop practices. This chart is provided as
an aid to the operator in the event he/she notices a condition that requires prompt attention
during the walk-around inspection or during operation, until the proper service personnel can
be notified. The Service and Maintenance manual provides specific torque values and
periodic maintenance procedures with a listing of individual components. Utilizing this
Torque Value Table in conjunction with the preventive maintenance section will enhance
safety, reliability, and performance of the machine.
3.2.4 Daily Walk-around Inspection
It is the operator’s responsibility to inspect the machine before the start of each workday. It is
recommended that each operator inspect the machine before operation, even if the machine
has already been put into service under another operator. This Daily Walk-Around Inspection
is the preferred method of inspection. These checks are also to be performed after
maintenance has been performed on the machine.
In addition to the Daily Walk-Around Inspection, be sure to include the following as part of
the daily inspection:
1)
Overall cleanliness
.
Check all standing surfaces for oil, fuel and hydraulic oil spillage and foreign objects. Ensure
overall cleanliness.
2)
Placards.
Keep all information and operating placards clean and unobstructed. Cover when spray
painting or shot blasting to protect legibility.
3)
Operation and Safety Manual.
Summary of Contents for BA14J-AWD
Page 1: ...Operation Maintenance Manual Table of Contents Dingli Machinery i Series 1 ...
Page 51: ...Operation Maintenance Manual Section4 Machine Controls and Indicators Dingli Machinery 4 17 ...
Page 52: ...Operation Maintenance Manual Section4 Machine Controls and Indicators Dingli Machinery 4 18 ...
Page 53: ...Operation Maintenance Manual Section4 Machine Controls and Indicators Dingli Machinery 4 19 ...
Page 84: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 2 ...
Page 85: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 3 ...
Page 86: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 4 ...
Page 87: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 5 ...
Page 88: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 6 ...
Page 89: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 7 ...
Page 90: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 8 ...
Page 91: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 9 ...
Page 92: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 10 ...
Page 93: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 11 ...
Page 94: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 12 ...
Page 95: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 13 ...
Page 96: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 14 ...
Page 97: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 15 ...