Operation & Maintenance Manual
Section3-User Responsibility, Machine
Preparation, and Inspection
Dingli Machinery
2-3
Lower and Mid Boom Up
30-38 sec
Lower and Mid Boom Down
22-28 sec
Machine Orientation When Doing Speed Tests
Lift
: Boom Retracted. Telescope Retracted. Lift Up, Record Time, Lift Down, Record Time.
Swing
: Boom at Full Elevation. Telescope Retracted. Swing the Turntable to the end stop.
Swing the Opposite Direction, Record Time.
Telescope
: Boom at Full Elevation; Telescope Retracted; Telescope Out, Record Time.
Telescope In, Record Time.
Drive
: Test to be done on a smooth level surface. Drive Select Switch should be set at 2WD
High Engine. Start approximately 25 ft. (7.62 m) from starting point so that the unit is at
maximum speed when starting the test. Results should be recorded for a 200 ft. (60.96 m)
course. Drive Forward, record time. Drive Reverse, Record Time.
Drive (Above Horizontal)
: Test should be done on a smooth level surface. Drive Select
Switch should be set to 2WD High Engine. The Platform Speed Knob should be selected out
of the creep speed. This verifies that the switches are working when the boom is above
horizontal. Results should be recorded for a 50 ft. course. Drive Forward, Record Time. Drive
Reverse, Record Time.
Platform Rotate
: Platform level and completely rotated one direction. Rotate the opposite
direction, Record Time. Rotate the other direction, Record Time.
Articulating Jib
: Platform level and centered with the boom. Start with the Jib down. Jib Up,
Record Time. Jib Down, Record Time.
Lower Lift
: Upper Boom horizontal. Telescoped In. Lower Lift Up, Record Time. Lower Lift
Down, Record Time.
Test Notes
1. Stop watch should be started with the function, not with the controller or switch.
2. Drive test results reflect 12x16.5 tires.
3. All speed tests are run from the platform. These speeds do not reflect the ground control
operation.
4. The platform speed knob control must be at full speed (turned clockwise completely).
5. Function speeds may vary due to cold, thick hydraulic oil. Test should be run with the oil
temperature above 100° F (38° C).
Summary of Contents for BA14J-AWD
Page 1: ...Operation Maintenance Manual Table of Contents Dingli Machinery i Series 1 ...
Page 51: ...Operation Maintenance Manual Section4 Machine Controls and Indicators Dingli Machinery 4 17 ...
Page 52: ...Operation Maintenance Manual Section4 Machine Controls and Indicators Dingli Machinery 4 18 ...
Page 53: ...Operation Maintenance Manual Section4 Machine Controls and Indicators Dingli Machinery 4 19 ...
Page 84: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 2 ...
Page 85: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 3 ...
Page 86: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 4 ...
Page 87: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 5 ...
Page 88: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 6 ...
Page 89: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 7 ...
Page 90: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 8 ...
Page 91: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 9 ...
Page 92: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 10 ...
Page 93: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 11 ...
Page 94: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 12 ...
Page 95: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 13 ...
Page 96: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 14 ...
Page 97: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 15 ...