Installation Guide
ECL Comfort 310, application A376
8.3 Schedule output
Application A376.9 only:
Besides the week schedules for the circuits 1, 2 and 3, this week
schedule controls relay output R6.
The week schedule is set in the same way as the week schedules for
circuits 1, 2 and 3.
Comfort periods will activate the relay 6 in order to close the
contacts.
148
DEN-SMT/DK
VI.GU.B1.02
Danfoss District Energy