ESIE13-03
|
Part 3. Repair
2. Unit specific repair procedures
13/05/15
|
Version 2.0
Page 131
Ground source heat pump
Figure 51 - Replacing the water manometer - 2
Installation
1. Stick the recuperated insulation at the rear of the water manometer.
2. Proceed in reverse order.
3. Fill the water circuit, refer to “To fill the space heating circuit” in the Daikin Altherma ground source heat pump Installer
reference guide.
4. Purge the water circuit, refer to “9.3 Air purge function on the space heating circuit” in the Daikin Altherma ground source heat
pump Installer reference guide.
2.2.19. Replacing the brine manometer
2.2.19.1 Preliminary actions
1. Remove the front panel, refer to
"Removing the front panel" on page 85
2. Remove the top panel, refer to
"Removing the top panel" on page 88
.
3. Remove the switch box cover, refer to
"Removing the switch box cover" on page 89
.
4. Drain the water circuit, refer to
"Draining the water circuit" on page 87
.
5. Remove PCB A10P, refer to
"Procedure: replacing the A10P PCB" on page 97
.
2.2.19.2 Procedure
Removal
1. Partially remove the insulation from the brine pressure relief valve to gain access to the nut (2) that fixes the capillary.
2. Loosen the nut (2) and remove the manometer capillary (3) from the brine pressure relief valve.
3. Press the brine manometer (7) out of its support.
1. Water manometer
2. Insulation
C
AUTION
The capillary of the water manometer must be wrapped with insulation behind the gauge.
I
NFORMATION
The capillary connection is sealed by a copper seal; when removing the brine manometer capillary from the pressure
relieve valve, make sure not to lose the copper seal.