3.3.4.2. AC Connections
This section includes instructions to connect the AC conductors to the
inverter and grounding options.
Table 3-9 Tools Required for Cable termination
No.
Tools
Remark
1
5mm flat screwdriver
Internal grounding bar
2
#3 Phillips head screwdriver
External grounding
3
14mm hex socket wrench
AC terminal block
4
Diagonal pliers or cable cutters
Cut cable
5
Wire stripping pliers
Remove jacket
6
Crimping pliers/tool
Crimp terminal
1. Using the 1-1/2 inch knockouts.
Remove the liquid-tight hole plug
from the right side or bottom of the AC input portion of the wiring box
to install 1-1/2 inch Trade Size conduit and conduit fittings into the
hole. Then route the cables through the conduit inside the wiring box.
If 2 or 2-1/2 inch Trade Size conduit is required see Step 2.
2. Using the removable gland plate.
Optionally, all AC conductors may
be routed through a single large knock-out hole on a removeable
gland plate at the bottom of the wiring box. Refer to
Fig 3-32
. The
plate may be drilled or punched for up to 2-1/2 inch conduit.
Summary of Contents for SCA50KTL-DO/US-480
Page 2: ......
Page 6: ......
Page 53: ...47 Figure 3 24 Bypass Terminal option installed within the Standard wirebox ...
Page 139: ...133 Figure 10 1 CPS SCA50KTL kW and kVA derating curves of PV input voltage ...
Page 140: ...134 Figure 10 2 CPS SCA60KTL kW and kVA derating curves of PV input voltage ...
Page 141: ...135 Figure 10 2 CPS SCA60KTL Reactive Power Capability ...