5. Commissioning
Before powering up the PV system it is important to check the installation for any
hazards that may be present. For convenience a commissioning checklist is
included in this manual and can be found in the Appendix.
5.1
Mechanical Installation
Make sure that the mounting bracket is secure and all screws have
been tightened to the specified torque values. (Refer to 3.2
Mechanical installation)
Confirm all knockouts are sealed and conduit is securely attached to
the inverter, creating a water-tight seal.
5.2
Conductor Connections
Make sure all conductors are connected to the right terminals and
properly labeled.
The appropriate cable management is important to avoid physical
damage. No sharp edges from cable ties exist.
Check polarity of DC input conductors. The DC Switch should be in
the
“OFF” position. (Refer to 3.3 Electrical installation)
5.3
Electrical Check
Make sure that the AC circuit breaker is appropriately sized.
Test whether the AC voltage is within the normal operating range.
Confirm the DC open circuit voltage of input strings is less than
1000V.
WARNING:
Please follow the guidelines below before on-grid operation to
eliminate possible dangers and to ensure safety.
Summary of Contents for SCA50KTL-DO/US-480
Page 2: ......
Page 6: ......
Page 53: ...47 Figure 3 24 Bypass Terminal option installed within the Standard wirebox ...
Page 139: ...133 Figure 10 1 CPS SCA50KTL kW and kVA derating curves of PV input voltage ...
Page 140: ...134 Figure 10 2 CPS SCA60KTL kW and kVA derating curves of PV input voltage ...
Page 141: ...135 Figure 10 2 CPS SCA60KTL Reactive Power Capability ...