109
6 Operation
6.1
Start-Up
Automatic start-up
: The inverter will start up automatically when the output
voltage and power of PV arrays meet the set value, AC power grid is normal,
and the ambient temperature is within allowable operating range.
Manual Power ON/OFF
: Manual Power ON/OFF is required after regulation
setting or manual (fault) shut-down. Press
ESC
to and
ENT
to access the Main
Menu, move the cursor to
“ON/OFF” and press
ENT
. Once in the “ON/OFF”
submenu, move the curser to
“ON” and press
ENT
to start the inverter. Then
the inverter will start up and operate normally if the start-up condition is met.
Otherwise, the inverter will go to stand-by mode.
6.2
Shut-Down
Automatic shutdown
: The inverter will be shut down automatically when the
output voltage and power of PV modules are lower than the set value, AC
power grid fails, or the ambient temperature exceeds the normal range.
Manual shutdown
: Normally, it is not necessary to shutdown the inverter, but
it can be shut down manually if regulation setting or maintenance is required.
Press
ESC
and then
ENT
to access the Main Menu. Move the cursor to the
submenu
Manual
Power ON/OFF
and press
ENT.
Move the cursor
to “OFF”
and press
ENT
, and then the inverter will be shut down.
Summary of Contents for SCA50KTL-DO/US-480
Page 2: ......
Page 6: ......
Page 53: ...47 Figure 3 24 Bypass Terminal option installed within the Standard wirebox ...
Page 139: ...133 Figure 10 1 CPS SCA50KTL kW and kVA derating curves of PV input voltage ...
Page 140: ...134 Figure 10 2 CPS SCA60KTL kW and kVA derating curves of PV input voltage ...
Page 141: ...135 Figure 10 2 CPS SCA60KTL Reactive Power Capability ...