1
Before You Start…
Scope
This Installation and Operation manual contains important information, safety
guidelines, detailed planning and setup information for installation, as well as
information about configuring, operating and troubleshooting the
CPS SCA50KTL-DO/US-480 and CPS SCA60KTL-DO/US-480
3-Phase String Inverters. Here after in this manual this equipment may be
referred to simply as the inverters. Be sure to read this manual carefully before
operating or servicing the inverters.
Audience
The information
in Chapters 2 “Overview”, 5 “User Interface", 6 "Operation”,
and 8 "Accessories" is intended for the owner and operator of the inverter, and
does not require any special training or qualifications. The information in
Chapters 3
“Installation”, 4 "Commissioning", 7 “Maintenance and
De-Installat
ion” is intended for qualified personnel only. Qualified personnel
have training, knowledge, and experience in:
Installing electrical equipment and PV power systems (up to 1000V
DC
).
Applying all local installation codes.
Analyzing and eliminating the hazards involved in performing electrical
work.
Selecting and using Personal Protective Equipment (PPE).
Installation, commissioning, troubleshooting, and maintenance of the inverter
must be done only by qualified personnel.
Summary of Contents for SCA50KTL-DO/US-480
Page 2: ......
Page 6: ......
Page 53: ...47 Figure 3 24 Bypass Terminal option installed within the Standard wirebox ...
Page 139: ...133 Figure 10 1 CPS SCA50KTL kW and kVA derating curves of PV input voltage ...
Page 140: ...134 Figure 10 2 CPS SCA60KTL kW and kVA derating curves of PV input voltage ...
Page 141: ...135 Figure 10 2 CPS SCA60KTL Reactive Power Capability ...