6
SECTION 6 DIRECTIONS FOR USE
6.1 INSPECTION PRIOR TO USE
Prior to each use, all components should be inspected for damage or irregularities. The device should not be used
if any damage or irregularity is observed. The user should contact CooperSurgical Customer Service if any damage
or irregularities are noticed.
The sequence of operations listed below is recommended to ensure safe and effective functioning of the device.
6.2 MOUNTING THE ALLY UPS
1.
Position patient on operating room table in dorsal lithotomy position with legs in stirrups. Refer to leg stirrup
manufacturer’s instructions for proper use and positioning. Ensure patient is placed such that the buttocks
are as close to edge as possible.
2.
Lower or remove foot end of the operating room table.
3.
Attach the ALLY UPS to the operating room table by
placing the rail clamp on the patient’s right side near
the stirrup. Lower the mounting tab of the ALLY UPS
into the rail clamp.
4.
Tighten the knob by hand until secure. Check security of
hold by trying to slide off the rail. Figure 2a shows how to
install the rail clamp over the cutouts in the rail. Figure 2b
shows the “final” position of the clamp once it is on the rail.
For optimum position, locate the top corner of ALLY UPS
within the area between the introitus and the end of the pad.
Figure 2a:
Installing the
rail clamp
Approximate
location of
introitus
Figure 2b:
Move the clamp to the right
away from the slots in the rail
NOTE:
Leave a minimum gap of 3” (7.6 cm)
between rail clamps for the mounting bar.
Rail clamp
#1 for the
ALLY UPS
Rail clamp #2
for the stirrup
Figure 2c:
Installing the main unit into the ALLY UPS rail clamp
(A)
WARNING:
Read all instructions carefully. Failure to properly follow instructions may cause
improper functioning of the device.
!
ALLY Uterine Positioning System
®
(ENGLISH)