156
Raption 50 Series User Manual
C
Maximum output power for AC
For setting the maximum output power for AC is necessary to use de software
‘Charge
Point Setup’
, ask for it to the CIRCONTROL technical support staff.
Steps:
1- Execute Charge Point Setup
2- Introduce the Charge Point’s IP and push over
‘Connect’
tab.
3- Write down the
‘Max. Current per plug (A)’
and push over
‘Apply settings’
tab.
Summary of Contents for Raption 50 Series
Page 1: ...User Manual Raption 50 Series ...
Page 2: ......
Page 4: ......
Page 12: ...08 Raption 50 Series User Manual C Dimensions Units specified in millimeters ...
Page 17: ...13 ...
Page 20: ...16 Raption 50 Series User Manual Next screen will appear press over your language s flag ...
Page 40: ...36 Raption 50 Series User Manual 3 CONNECTOR DISABLE 4 CONNECTOR IN USE ...
Page 41: ...37 5 CONNECTOR RESERVED 6 CONNECTOR BLOCKED PER RESERVED ...
Page 42: ...38 Raption 50 Series User Manual 7 CONNECTOR BLOCKED PER CHARGING ...
Page 75: ...71 ...
Page 101: ...97 ...
Page 161: ...157 ...