5-14
August 2003
Access Navigator - Release 1.8
Physical Installation
Attach Access Navigator to Crossbars
Figure 5-8. Bracket Installation
Figure 5-9. Spacing Requirements
Mount bracket here
for flush mount.
Mounting
Brackets
Mount bracket here for
5 inch forward offset.
Fasten brackets to
Access Navigator
with 6-32 x 3/8"
undercut screws
(four per side).
C
A
D
Fasten brackets to
crossbar with
12-24 x 5/8 inch
machine screws
(two per side).
B
19-inch Equipment Rack
(5 units per row maximum)
23-inch Equipment Rack
(6 units per row maximum)
1.75 inch
Bracket spacing
0.75 inch
Minimum air space
A
B
C
D
E
A
B
C
D
E
F
1.75
17.25
Summary of Contents for Access Navigator
Page 1: ...Access Navigator USER MANUAL Part Number 770 0079 AP Product Release 1 8 August 2003 ...
Page 170: ...6 66 August 2003 Access Navigator Release 1 8 Electrical Installation Exit Management Session ...
Page 214: ...9 20 August 2003 Access Navigator Release 1 8 Provision DCS Service Test DS1 and DS0 Circuits ...
Page 342: ...14 22 August 2003 Access Navigator Release 1 8 Alarm Clearing Ethernet Link Status LED ...
Page 634: ...18 178 August 2003 Access Navigator Release 1 8 CLI Language Reference CLI Command List ...
Page 658: ...B 6 August 2003 Access Navigator Release 1 8 FDL Interface Access Bank II Capabilities ...
Page 668: ...C 10 August 2003 Access Navigator Release 1 8 SNMP Interface SNMP Trap Reports ...
Page 682: ...GlossaryGlossaryGlossaryGlossary 14 August 2003 Access Navigator Release 1 8 Glossary ...
Page 704: ...Index 1 22 August 2003 Access Navigator Release 1 8 Index ...