Access Navigator - Release 1.8
August 2003
6-35
Electrical
Installation
DC Power Connections
DC Power Connections
Installation Summary
n
Precautions
... 6-35
n
Tools and Materials
... 6-35
n
Wire Power Connectors
... 6-36
n
Verify Wiring
... 6-37
n
Connect Power Plugs to Access Navigator
... 6-37
Precautions
DANGER!
H
IGH
VOLTAGE
SHOCK
HAZARD
. D
O
NOT
WIRE
CONNECTORS
WHILE
POWER
IS
ON
.
CAUTION!
B
OTH
POWER
CONNECTORS
MUST
BE
WIRED
AND
CONNECTED
TO
POWER
SOURCES
. F
AILURE
TO
DO
SO
WILL
DISABLE
REDUNDANT
SWITCHING
FEATURES
AND
MAY
INTERRUPT
SERVICE
.
WARNING!
P
OWER
INPUT
CONNECTORS
ARE
FOR
–48V DC
POWER
ONLY
.
Tools and Materials
NOTE:
If the power connector is wired to a fuse panel, use a 5.0 Amp slow-blow fuse.
Obtain the following tools and materials:
•
Pliers, needle nose
•
Cutters, diagonal
•
Wire stripper, 16-26 AWG
•
Continuity tester
•
Volt-ohm meter
•
16 or 18 AWG insulated copper wire for power connections, as required by standard wiring
practices
Summary of Contents for Access Navigator
Page 1: ...Access Navigator USER MANUAL Part Number 770 0079 AP Product Release 1 8 August 2003 ...
Page 170: ...6 66 August 2003 Access Navigator Release 1 8 Electrical Installation Exit Management Session ...
Page 214: ...9 20 August 2003 Access Navigator Release 1 8 Provision DCS Service Test DS1 and DS0 Circuits ...
Page 342: ...14 22 August 2003 Access Navigator Release 1 8 Alarm Clearing Ethernet Link Status LED ...
Page 634: ...18 178 August 2003 Access Navigator Release 1 8 CLI Language Reference CLI Command List ...
Page 658: ...B 6 August 2003 Access Navigator Release 1 8 FDL Interface Access Bank II Capabilities ...
Page 668: ...C 10 August 2003 Access Navigator Release 1 8 SNMP Interface SNMP Trap Reports ...
Page 682: ...GlossaryGlossaryGlossaryGlossary 14 August 2003 Access Navigator Release 1 8 Glossary ...
Page 704: ...Index 1 22 August 2003 Access Navigator Release 1 8 Index ...