Apply Power and Verify Operation
Apply Power and Verify Operation
1. Apply –48 VDC power to Access Navigator and verify the following front panel status indications
(see Figure 6-26).
Requirement:
CONTROLLER A POWER
indicator lights green.
Requirement:
CONTROLLER A ACTIVE
indicator lights green.
2. If second (redundant) controller is present, verify the following front panel status indications.
Requirement:
CONTROLLER B POWER
indicator lights green.
Requirement:
CONTROLLER B ACTIVE
indicator is off.
NOTE:
If power indicators do not light, check power connections (see
DC Power
Connections
on
page 6-35
).
Figure 6-26. Location of Front Panel Power-On Status LEDs
Controller ’A’ Indicators
Controller ’B’ Indicators
Active
Controller
Power
Summary of Contents for Access Navigator
Page 1: ...Access Navigator USER MANUAL Part Number 770 0079 AP Product Release 1 8 August 2003 ...
Page 170: ...6 66 August 2003 Access Navigator Release 1 8 Electrical Installation Exit Management Session ...
Page 214: ...9 20 August 2003 Access Navigator Release 1 8 Provision DCS Service Test DS1 and DS0 Circuits ...
Page 342: ...14 22 August 2003 Access Navigator Release 1 8 Alarm Clearing Ethernet Link Status LED ...
Page 634: ...18 178 August 2003 Access Navigator Release 1 8 CLI Language Reference CLI Command List ...
Page 658: ...B 6 August 2003 Access Navigator Release 1 8 FDL Interface Access Bank II Capabilities ...
Page 668: ...C 10 August 2003 Access Navigator Release 1 8 SNMP Interface SNMP Trap Reports ...
Page 682: ...GlossaryGlossaryGlossaryGlossary 14 August 2003 Access Navigator Release 1 8 Glossary ...
Page 704: ...Index 1 22 August 2003 Access Navigator Release 1 8 Index ...