On-line Operations
18-17
Initiating Frame Relay Backup Switchover/Switchback
Frame relay backup
DLCIs can be configured (as described in
Chapter 7
) to automat-
ically become operational a set time after failure of a primary DLCI, and to switch
back to the primary a set time after the primary becomes operational again. These
automatic settings can be overridden via Frame Relay Backup Operations (
[B], [J]
from the Main Menu).
From the Frame Relay Backup Operations Menu:
●
To switch from a primary to one of its backups, press
[A]
.
●
To switch from a backup to a primary, press
[B]
.
In either case, enter (as prompted) the requested information to identify the primary
and backup.
Summary of Contents for Netlink FRX4000
Page 2: ......
Page 16: ...xiv FRX4000 FRX6000 4 0 User Guide Rev 01 ...
Page 17: ...Section I Getting Started ...
Page 18: ......
Page 24: ......
Page 37: ...Section II Configuration ...
Page 38: ......
Page 52: ......
Page 78: ......
Page 106: ...7 24 FRX4000 FRX6000 4 0 User Guide Rev 01 ...
Page 142: ...8 36 FRX4000 FRX6000 4 0 User Guide Rev 01 ...
Page 186: ......
Page 216: ......
Page 266: ......
Page 273: ...Section III Operation ...
Page 274: ......
Page 296: ......
Page 324: ......
Page 376: ......
Page 377: ...Section IV Appendices ...
Page 378: ......
Page 384: ......
Page 390: ......
Page 396: ......
Page 400: ......
Page 405: ...Menu Structure E 5 ...
Page 406: ...E 6 FRX4000 FRX6000 4 0 User Guide Rev 01 ...
Page 425: ......
Page 426: ......