Internal Battery Replacement
236
4.
Connect plastic tabs on the red wire to (+) positive terminal and black wire to (-) negative
terminal
on the replacement battery. Place battery in base of casing; metal terminals should
be flattened and wires should be to the left of battery.
Terminal tab connections
New battery properly
installed within base
Figure E-17. Connect Wires on Battery for ASG Guard
5.
Reconnect the white connector to the 2-prong connector located to the left of the battery.
Figure E-18. Connect 2-Prong Connector for ASG Guard
Summary of Contents for Lucent Technologies Access Security Gateway Guard
Page 12: ...x Page intentionally left blank ...
Page 28: ...ASG Guard Overview 16 Page intentionally left blank ...
Page 36: ...Physical Connections 24 Page intentionally left blank ...
Page 60: ...Modem Port Setup 48 Page intentionally left blank ...
Page 82: ...Modifying the User Database 70 Page intentionally left blank ...
Page 120: ...Action and Event Tables 108 Page intentionally left blank ...
Page 158: ...User Connectivity 146 Page intentionally left blank ...
Page 188: ...Log Functions 176 Page intentionally left blank ...
Page 236: ...Troubleshooting 224 Page intentionally left blank ...
Page 252: ...Internal Battery Replacement 240 Page intentionally left blank ...
Page 258: ...Glossary of Command References 246 Page intentionally left blank ...